3-D Conceptual Site Diagrams
| 1943 Conceptual Diagram This 3-D block diagram shows the conditions of the site in 1943 after the ponds were constructed to aid in the disposal of wastewater. |
|
| 1968 Conceptual Diagram This 3-D block diagram shows the conditions of the site in 1968 at the height of industrial discharges to the ponds. |
|
| 1976 Conceptual Diagram This 3-D block diagram shows the conditions of the site in 1976 when discharges to the ponds stopped. |
|
| 1992 Conceptual Diagram This 3-D block diagram shows the conditions of the site in 1992 when no discharges (except to the lined Timet ponds) were occurring. |
|
| 2005 Conceptual Diagram This 3-D block diagram shows the current conditions of the site, prior to remediation. |
|
| Future Conceptual Diagram This 3-D block diagram shows the projected conditions of the site, after development. |
|
![]()