Header 3-D Conceptual Site Diagrams

1943 Conceptual Diagram
This 3-D block diagram shows the conditions of the site in 1943 after the ponds were constructed to aid in the disposal of wastewater.
   
1968 Conceptual Diagram
This 3-D block diagram shows the conditions of the site in 1968 at the height of industrial discharges to the ponds.
   
1976 Conceptual Diagram
This 3-D block diagram shows the conditions of the site in 1976 when discharges to the ponds stopped.
   
1992 Conceptual Diagram
This 3-D block diagram shows the conditions of the site in 1992 when no discharges (except to the lined Timet ponds) were occurring.
   
2005 Conceptual Diagram
This 3-D block diagram shows the current conditions of the site, prior to remediation.
   
Future Conceptual Diagram
This 3-D block diagram shows the projected conditions of the site, after development.
   