The restoration project is located northeast of downtown Henderson. The site is bounded by Boulder Highway to the southwest, Lake Mead Parkway to the southeast, the Las Vegas Wash to the north and Pabco Road to the west.

The address is 796 Mohawk Drive, Henderson, Nevada. Click here to view map.

From Interstate 95/93 going south - Exit Lake Mead Parkway exit 61B. It is approximately 3 miles from the exit to Mohawk Drive.

From Interestate 95/93 going north - Exit Lake Mead Parkway exit 61. It is approximately 3 miles from the exit to Mohawk Drive.

For additional assistance, please contact us at 702.567.0400.

Did you know…

The clean-up effort is voluntary and funded entirely by private dollars. No public funds have or will be used in the entire process.

Did you know...

The Muddy Creek formation underlies the Qa.  The Muddy Creek formation underlies much of the Las Vegas Valley and is more than 2,000 feet thick in places.  The upper portion beneath the site is referred to as TMCf.  The soil of the TMCf underlying the site is typically fine-grained (sandy silt and clay silt), although layers with increased sand content are also sporadically encountered.

Did you know…

The new master planned community will feature 526 acres of parks and open space  adjacent to the Las Vegas Wash, the River Mountain Loop Trails and the Henderson Birding Preserve offering residents a multitude of outdoor recreational opportunities.

Did you know…

The site's soil will be analyzed before and after the remediation. Each home site will be retested again before any residential construction begins.

Did you know…

Approximately 400 acres of the 2,200 acres on the property require remediation and clean-up. There has never been any industrial activity on the remainder of the site, most of which has remained virgin desert.  The evaporation ponds are now inactive.  The soil underlying the ponds will be excavated and transported to a lined and monitored Corrective Action Management Unit(CAMU), off site.  No excavated soils will be disposed of on-site.